VRX Technologies

Building electrification · Critical environments · Data-center cooling

01 / Dual-deck + multi-zone

Electrify now. Keep your existing electrical service.

Replace hard-to-electrify rooftop equipment with solutions engineered around the curbs, ducts, and electrical capacity your building already has.

01 / 07 Play film

Explore our seven solution areas

Zero
Added amps vs. replaced legacy units
8 hr
Designed replacement window, direct fit
−13°F
Glycol-free economizer operation
96–97%
Water reduction, data center assist

01 / What we build

Electrification without the electrical upgrade.

Most buildings cannot electrify because the service will not take the load. VRX equipment is engineered to replace legacy gas equipment at end of life within the electrical envelope the building already has.

Crew setting an all-electric replacement rooftop unit onto the existing curb
Electrification without the electrical upgrade

02 / Watch it happen

A changeout you can schedule over a weekend.

McQuay RPS direct replacement with hot water generation
Multi-zone direct replacement — any legacy brand

03 / AI data centers

Cooling engineered around the constraint stack.

Water, community acceptance, capital timing and execution speed are the constraints that stall data center projects — not tonnage. HydroCore is a modular 300‑ton platform designed against all four, so CapEx follows demand instead of leading it.

Less cooling water96–97%
Staged modules300 tons
Adiabatic assistOptional
Rendering of a modular cooling fleet installed alongside a data center campus
Modular data center cooling — rendering

04 / Built for the spec

Claims an engineer can defend.

VRX was founded by the builder of Alliance Air Products — organically grown into one of the major providers of data center cooling in the United States. We write performance and code‑compliance claims the way consulting engineers have to read them: evidence‑based, project‑specific, and reviewed against ASHRAE 90.1, ASHRAE 90.4 and California Title 24 pathways.

Engineering submittal supportSpec-ready
Energy-code pathway analysis90.1 / 90.4 / T24
Cost and O&M modeling10-yr lifecycle
Field-proven direct-fit installsReference projects
Factory piping header assembly with service valves on a replacement unit
Claims an engineer can defend

Start with the equipment you already have.

Send us a unit schedule, a load profile or the constraint that is holding the project up. You will hear back from someone who can read it.